In progress
        Vinh Hao – Phan Thiet section is adjacent to the starting point of Phan Thiet – Dau Giay expressway sub-project, is in Binh Thuan province where the natural conditions and climate are extremely harsh. Contract Package XL04 was commenced in December 2020 with 24 months for completion. This has been a […]
My Thuan - Can Tho expressway is approximately 23 kilometers long. The Project has the total investment of VND 4,800 billion with the Ministry of Transport is the Employer and Cuu Long Corporation for Investment Development and Project Management of Infrastructure (My Thuan Project Management Unit now) is the project management entity.
Vinh Hao - Phan Thiet Expressway Section under the Eastern North - South Expressway Construction Investment Project for the 2017 - 2020 period has the total length of 100.82km, passes through 4 districts in Binh Thuan province. This Section starts at Km134 in Vinh Hao commune, Tuy Phong district, Binh Thuan province
Long Son Petrochemicals – LSP is the first petrochemical complex in Vietnam having capacity up to 1.6 million tons/year which will produce substitutes for imported polyolefins. The Project also includes other infrastructures apart from the petrochemical complex and a deep-water port.
Cam Lo - La Son Expressway Section Construction Investment Subproject has a total investment of VND 7,669 billion with a length of 98 km. The project has the Ministry of Transport as the Employer and Ho Chi Minh Highway Project Management Unit as the Procuring Entity. The project is divided into 28 packages, of which 11 are civil works ones.
The contract for implementation of the Completion of the Main Road and Construction of Frontage Roads from the Expressway to Van Don Airport Project was signed in December 2019. The project will upgrade a road of 4.3 km long in accordance with standards for expressway
The My Thuan 2 Bridge and approach roads at both sides construction project is a major transport project which will help complete the transport network connecting completed and under-construction main roads in the region, easing the burden on current My Thuan Bridge and National Highway No. 1. When it is completed, My Thuan 2 Bridge will link Trung Luong - My Thuan expressway and My Thuan - Can Tho expressway to complete the expressway from Ho Chi Minh City to Can Tho City.
Metro Line 1 – Ben Thanh – Suoi Tien Line is a 19.7 kilometer long project with total 14 stations. This is the first line to be built under the whole Metro Line system; the subway shall be built according to Ho Chi Minh City urban railway planning. VNCN Engineering Construction and Investment Joint Stock Corporation shall implement construction from July, 2018.
Nhon – Hanoi station railway line has total investment of over 36,000 billion VND, with 12.5 km length, including 8.5km of high line from Nhon to Kim Ma and 4km underground from Kim Ma to Hanoi station. The railway has 8 high stations, 4 underground stations and Depot area in Nhon.
Package J1: Binh Khanh Bridge and Approach (Km21+739.5 – Km24+503)
- Employer: Vietnam Expressway Corporation (VEC)
- Funding: Japan International Cooperation Agency (JICA) + counterpart fund
- Location: Ho Chi Minh City, Vietnam
- Construction period: 47 months