About Us

Web links


Online
  • Online : 3
  • Visitor :


COMPLETION OF THE MAIN ROAD AND CONSTRUCTION OF FRONTAGE ROADS FROM THE EXPRESSWAY TO VAN DON AIRPORT PROJECT

  • • Contract Package No. 06: Construction of Works and Installation of Equipment
  • • Location: Quang Ninh province, Vietnam
  • • Employer: Projects Management Board for Investment and Construction of Transport Works of Quang Ninh Province
  • • Main Contractor: Huy Hoang – Thang Long – VNCN E&C – An Phu Joint Venture
  • • Contract type: Construction
  • • Contract value: VND 354 billion
  • • Construction period: 2020 – 2021

The contract for implementation of the Completion of the Main Road and Construction of Frontage Roads from the Expressway to Van Don Airport Project was signed in December 2019. The project will upgrade a road of 4.3 km long in accordance with standards for expressway. VNCN E&C together with other members of the Joint Venture has mobilized equipment and manpower to organize the construction. Details of Contract Package No. 06 are as below:

  •  • Total length of expressway: L = 4.267 km. Design velocity: Vdesign = 100Km/h. B = 25.25 ÷ 58.55m.
  •  • Construction of frontage roads along the expressway in accordance with standards for plain road of grade III; total length L = 3.44km; B = 7.0m ÷ 14.0m.
  •  • Embankment: Normal cut and fill.
  •  • Doan Ket intersection: An at-grade intersection connecting turns of Cam Hai – Van Don Expressway Section.
  •  • Construction of an interchange of the expressway and the road leading to Van Don Airport.
  •  • Construction of a roundabout for connecting frontage roads in and out the Airport.
  •  • Construction of drainage system and traffic safety system, etc.
  •  • Construction of Bo Lay bridge: L = 32.3m; B = 56.5m.

VNCN E&C has been mobilizing equipment and manpower for speeding up the implementation of the project, paying special attention to the safety during construction and the quality of works. This project will be a drive for development of Van Don district in line with the strategy of Quang Ninh province, which will increase the attraction of investment to Van Don district, create conditions for linking major projects of Quang Ninh province and facilitate the travel of residents and tourists.