The contract for implementation of the Completion of the Main Road and Construction of Frontage Roads from the Expressway to Van Don Airport Project was signed in December 2019. The project will upgrade a road of 4.3 km long in accordance with standards for expressway
The My Thuan 2 Bridge and approach roads at both sides construction project is a major transport project which will help complete the transport network connecting completed and under-construction main roads in the region, easing the burden on current My Thuan Bridge and National Highway No. 1. When it is completed, My Thuan 2 Bridge will link Trung Luong - My Thuan expressway and My Thuan - Can Tho expressway to complete the expressway from Ho Chi Minh City to Can Tho City.
Metro Line 1 – Ben Thanh – Suoi Tien Line is a 19.7 kilometer long project with total 14 stations. This is the first line to be built under the whole Metro Line system; the subway shall be built according to Ho Chi Minh City urban railway planning. VNCN Engineering Construction and Investment Joint Stock Corporation shall implement construction from July, 2018.
Nhon – Hanoi station railway line has total investment of over 36,000 billion VND, with 12.5 km length, including 8.5km of high line from Nhon to Kim Ma and 4km underground from Kim Ma to Hanoi station. The railway has 8 high stations, 4 underground stations and Depot area in Nhon.
Package J1: Binh Khanh Bridge and Approach (Km21+739.5 – Km24+503)
- Employer: Vietnam Expressway Corporation (VEC)
- Funding: Japan International Cooperation Agency (JICA) + counterpart fund
- Location: Ho Chi Minh City, Vietnam
- Construction period: 47 months
Employer: Vietnam Expressway Corporation (VEC) Funding: Asian Development Bank (ADB) + counterpart fund Location: Ho Chi Minh City, Vietnam Construction period: 36 months
Employer: Vietnam Expressway Corporation (VEC) Funding: Asian Development Bank (ADB) + counterpart fund Location: Long An Province and Ho Chi Minh City, Vietnam Commencement: May 2015 Completion (planned): May 2018