Location: 18 Lang Ha – Dong Da –Ha Noi
Client: Petrovietnam
Construction period: From April 2006 to August 2007
Scope of work:
Construction an Office building – 19 floors with glass and stainless frame in front. Installation of M&E included: electric panels, lighting system, 2 generators 1500 kva, 6 elevators with 19 rest points, house plumbing, gas system, air conditioning system, fire hose, BMS.