NH10 Widening and Improvement Project – Construction of Quy Cao Bridge

Client: Project Management Unit no. 18 (PMU18) – Ministry of Transport
Contract Value:
100 billion Vietnamese Dong
Duration:
24 months

Project Scale:  
Total length of 524m, 12m width.

Girder structure: 
– Prestressing reinforce concrete girder, constructed by balance cantilever technology, L=62m (02 spans). 
– PCI girders with L = 35m (9 spans). 
– Total length of approach roads L=6.2, B=12m. 
– Asphalt concrete pavement structure. 
– Soft soil Treatment by PVD and geotextile.