Client: Project Management Unit no. 18 (PMU18) – Ministry of Transport
Contract Value: 100 billion Vietnamese Dong
Duration: 24 months
Project Scale:
Total length of 524m, 12m width.
Girder structure:
– Prestressing reinforce concrete girder, constructed by balance cantilever technology, L=62m (02 spans).
– PCI girders with L = 35m (9 spans).
– Total length of approach roads L=6.2, B=12m.
– Asphalt concrete pavement structure.
– Soft soil Treatment by PVD and geotextile.