Location: Ninh Binh province;
Client: Vietnam Expressway Corporation (VEC);
Contract period: 32 months;
Contract scale:
Construction 9.902 km new AC road, 28 m width including 2 intersections:
– Two RC bridges overpass intersections:
(i) Vuc Vong flyover: total length 245.35 m, PCI 33m structure, D1500 bored pile foundation.
(ii) Phu Thu flyover, total length 198.2m, prestressed concrete hollow slab structure, 45×45 cm concrete pile foundation.
– Drainage system: 19 RC pipes D1000, D1250, D1500 and 32 box culverts.
– Build new 11 pedestrian tunnels BxH: 4×2.7m, 6.5×3.2m, 4×3.2m.
Package No.2 of Cau Gie-Ninh Binh express way project goes through villages: Yen Bac, Tien Noi, Tien Ngoai, Tien Hiep that belong to Duy Tien district, Ha Nam province. The section from Km.218+500 located in Yen Bac village to Km.227+500.