Post categorized: Projects

PROJECT ON INVESTMENT CONSTRUCTION OF NGUYEN TRAI BRIDGE AND URBAN EMBELLISHMENT OF SURROUNDING AREA

  • COMPONENT PROJECT 1 : WORKS CONSTRUCTION UNDER PROJECT ON INVESTMENT CONSTRUCTION OF NGUYEN TRAI BRIDGE AND URBAN EMBELLISHMENT OF SURROUNDING AREA
  • PACKAGE NO. 15 : CONSTRUCTION OF APPROACH BRIDGE, APPROACH ROAD AND JUNCTION
  • EMPLOYER : MANAGEMENT BOARD OF HAI PHONG TRANSPORT WORKS INVESTMENT AND CONSTRUCTION PROJECT
  • CONSTRUCTION CONTRACTOR : JOINT VENTURE OF THANG LONG – VNCN E&C – THANG LONG BRIDGE 3 – HJC
  • CONTRACT VALUE : > 1,485 BILLION VND
  • IMPLEMENTATION PERIOD : 24 MONTHS
  • TYPE OF WORK : TRANSPORT WORK
  • CLASS OF WORK : SPECIAL

PHUOC AN BRIDGE CONSTRUCTION PROJECT

  • Project name: Phuoc An bridge connecting Phu My town, Ba Ria – Vung Tau province with Nhon Trach district, Dong Nai province.
  • Package: Construction of approach bridge from pier T40-T41 to pier T62
  • Location: Nhon Trach district, Dong Nai province
  • Employer: Cai Mep – Thi Vai Port Area Transport Project Management Board
  • Main contractor: VNCN Engineering Construction and Investment JSC. (VNCN E&C)
  • Type of work: Transport work
  • Class of work: Special
  • Contract value: 527 billion VND
  • Implementation period: 1,077 days

HOA BINH – MOC CHAU EXPRESSWAY CONSTRUCTION PROJECT

  • PACKAGE XL-01 : Construction of road and works of sections Km19+000 – Km34+990, Km37+87.870 – Km37+798.400 and Km38+911.540 – Km40+750
  • LOCATION : Da Bac district, Hoa Binh province
  • EMPLOYER : Project Management Board of Transport Works Construction Investment of Hoa Binh province
  • MAIN CONTRACTOR : Joint Venture of VNCN E&C – VINACONEX – HB479.
  • CONTRACT VALUE : 1,539 billion dong
  • IMPLEMENTATION PERIOD: 1,079 days

THE GROUNDBREAKING CEREMONY OF HOA BINH – MOC CHAU EXPRESSWAY

In the morning of the 29th day of September, 2024, in Xeo village, Cao Son commune, Da Bac district, Hoa Binh province, the Prime Minister Pham Minh Chinh participated in the Groundbreaking Ceremony of Hoa Binh – Moc Chau Expressway Project (Km19+000 – Km53+000 through Hoa Binh province).

INAUGURATION OF MY THUAN 2 BRIDGE

In 24 December 2023, the Ministry of Transport held the Inauguration Ceremony of 4 major transport projects including My Thuan 2 bridge.

RESUMPTION OF PACKAGE J1: BINH KHANH BRIDGE AND APPROACH

  • . Project: NORTH – SOUTH EXPRESSWAY CONSTRUCTION PROJECT (BEN LUC – LONG THANH SECTION)
  • . Package: PACKAGE J1 CIVIL WORKS (KM21+739.5 – KM24+503) BINH KHANH BRIDGE AND APPROACH
  • . Employer: VIETNAM EXPRESSWAY CORPORATION (VEC)
  • . Contractor: SHIMIZU – VNCN E&C JOINT OPERATION
  • . Funding: Official development assistance fund from Japan International Cooperation Agency (JICA)
  • . Construction period: The time for implementing the Contract is 47 months; The time for resumption and completion of the Package is estimated 24 months.

PROJECT: COMPLETION OF COASTAL ROAD 129 (VO CHI CONG ROAD) PROJECT COMPONENT NO. 2: THE ROAD FROM VO CHI CONG ROAD TO DONG QUE SON INDUSTRIAL ZONE CONNECTING NH.14H AND NH.1A

  • . Contract Package: Construction of project component 2, NH.14H connecting road, section Km0+00 – Km11+400
    Location: Quang Nam province
  • . Client: People’s Committee of Quang Nam province
  • . Representative of the Client: Project Management Board of Transport Works Construction Investment of Quang Nam province
  • . Construction Contractor: Joint Venture of VNCN Engineering Construction and Investment Joint Stock Corporation – M.E.I Material, Equipment & Investment Construction Joint Stock Company – Anh Duong Company Limited.
  • . Contract value: VND 173,645,137,000
  • . Implementation period: 720 days (from 16/9/2023)

CAO LANH – AN HUU EXPRESSWAY CONSTRUCTION PROJECT, PHASE 1 (PROJECT COMPONENT 1)

  • . Contract Package No. 14: Shop-drawing design – cost estimate and construction of section Km0+000 ~ Km16+000
  • . Location: Dong Thap province
  • . Client: People’s Committee of Dong Thap province
  • . Representative of the Client: Transport Works Construction Investment Project Management Board of Dong Thap province
  • . Construction Contractor: Joint Venture of VNCN Engineering Construction and Investment Joint Stock Corporation – Thien An Construction and Mechanical Company Limited – Dacinco Construction Investment Limited Company
  • . Contract value: VND 2,805,790,749,000
  • . Implementation period: 28 months (from 25 June 2023)

ROAD CONNECTING TRAN THUONG TEMPLE (HA NAM PROVINCE) AND TRAN TEMPLE (NAM ĐINH PROVINCE)

  • . Contract package No. 18: Construction of Line 2 (including traffic safety security cost and other related costs) – Phase 1
  • . Location: Ha Nam province
  • . Client: Construction Investment Project Management Board – Ha Nam province
  • . Construction Contractor: VNCN Engineering Construction and Investment Joint Stock Corporation (VNCN E&C)
  • . Contract value: VND 769,609,925,000
  • . Implementation period: 18 months