About Us

Web links


Online
  • Online : 1
  • Visitor :


National highway No. 38B improvement project – NIP/CP8 package

Location:  Trang bridge area – Hung Yen province;
Client:  Project Management Unit No. 2;
Contract period:  Started in March 2008, estimated complete in March 2010;

Contract scale:

  •  Total length:  20 km including AC road and 4 bridges;
  •   Width:   From 12 m to 34 m;
  •   Design standard:  Delta Road Type 3;
  •   Design speed:  80 km/h;
  •   Constract structure: 4 cast-in-situ RC bridges, beam-slab bridge type, concrete foundation with D1000 cast-in-situ RC pile system.