Location: Trang bridge area – Hung Yen province;
Client: Project Management Unit No. 2;
Contract period: Started in March 2008, estimated complete in March 2010;
Contract scale:
- Total length: 20 km including AC road and 4 bridges;
- Width: From 12 m to 34 m;
- Design standard: Delta Road Type 3;
- Design speed: 80 km/h;
- Constract structure: 4 cast-in-situ RC bridges, beam-slab bridge type, concrete foundation with D1000 cast-in-situ RC pile system.