Location:  Nghia Dan district, Quy Hop, Nghe An, Province.
Client:  PMU18
Contract Value: 86 billion Vietnamese Dong
Duration: 24 months 
Project Scale:  
Length L = 25.3km, average width 14m.
Asphalt concrete pavement structure.
Aggregate foundation, macadam type I, II.
Construction of 7 bridges with total length of 200m.
PCI girder structure (L=20m), bored pile foundation D=1000mm
Length L = 25.3km, average width 14m.
Asphalt concrete pavement structure.
Aggregate foundation, macadam type I, II.
Construction of 7 bridges with total length of 200m.
PCI girder structure (L=20m), bored pile foundation D=1000mm