Employer: Nghi Son Refinery and Petrochemical Limited Liability (PVN-IKC-MCI-KPI Joint Operation)
EPC Contractor: JGCS group includes JGC J/O, Chiyoda, GS E&C, SK E&C and Technip
Construction site: Thanh Hoá
Contract value: 681 billion (without VAT)
Nghi Son Refinery and Petrochemical Complex Project is the 2nd largest oil refinery plant in Vietnam after Dung Quat Oil Refinery project. The project has total on-shore area of 394ha and 259ha off-shore, total investment of the project is about $ 9 billion.
Under the contract with the main contractor JGCS, Vinaconex E&C is in charge of infrastructure construction for the entire region C200, C300 and C100 (a small part), Zone 2, Zone 3 of the project. The main works include earthworks, grading, cutting off the head of centrifugal concrete piles, concrete asphalt road system, the concrete structure, foundation of tanks and machine, permanent grooves, beam of pipe support, piperack foundation system, retaining walls, small foundation and pre-casted concrete structures …