PACKAGE CIVIL WORKS, CAN THO – HAU GIANG EXPRESSWAY

The Package Civil works: Construction of the entire route (including survey and design of shop-drawings), Can Tho – Hau Giang expressway belongs to the Eastern North – South Expressway Construction Project, period 2021 – 2025. The route is 37.65 kilometers in length with the beginning point at Km15+350 in Cai Rang district, Can Tho city and the ending point at Km53+000 in Vi Thuy district, Hau Giang province.

    The expressway is planned to have 4 traffic lanes with the width of pavement of 24.75m in the completed phase. In the first phase, the expressway is built to have 4 traffic lanes with the width of pavement of 17m and designed velocity of 80 km/h.

    The expressway has 4 interchanges to be constructed in accordance with standards for plain road class III. These interchanges include: IC2 crossing Nam Song Hau – NH1 linking road, IC3 crossing NH1, IC4 crossing NH61, and IC5 crossing NH61B.

PMU My Thuan and the Joint Venture Contractor at the Contract Signing Ceremony

     Truong Son – 36 – CC1 – VNCN E&C – Tan Nam was awarded the Package with the contract value of more than VND 7,555 billion and the construction period of 34 months.

  • Scale and technical specifications of main work items of the Package:
  • Construction of expressway:

+ Total length of the expressway: L= 32.72 km. Designed velocity V = 80km/h

+ The expressway is built to have 4 traffic lanes in the first phase and 6 traffic lanes in the completed phase.

+ The breadth of the roadbed in phase 1 is 17m, in completed phase is 24.75m

+ Pavement structure of main route: Highway type A1, Erequired ≥ 180 MPa

+ Roadbed: cut and fill

+ Construction of 4 interchanges: IC2, IC3, IC4 & IC5

+ Construction of frontage roads (B=3.5m); underpasses, drainage system, slope stabilization, traffic safety system.

  • Construction of bridge:

+ Construction of 28 bridges on the alignment and 04 interchanges

+ Sub-structure: pre-stressed RC pipe culvert D600, shallow footing, U-shape abutment, solid pier.

+ Super-structure: pre-tensioned or post-tensioned RC I-shape girder and Super T girder. The girder length depends on the location of bridges.

+ VNCN E&C constructs 9.02km expressway and 09 bridges including: NH1 Overpass, Hai Thin bridge, Xeo Mon Dai bridge, bridge No. 78, Long Son bridge, Duong Go bridge, Ca Dam bridge, Tu Sang bridge and Kenh Ngang bridge. VNCN E&C also builds the traffic safety system and the drainage system of the route.