Post categorized: Projects

CONTRACT PACKAGE XL.03A MY THUAN 2 BRIDGE AND APPROACH ROADS AT BOTH SIDES CONSTRUCTION PROJECT

The My Thuan 2 Bridge and approach roads at both sides construction project is a major transport project which will help complete the transport network connecting completed and under-construction main roads in the region, easing the burden on current My Thuan Bridge and National Highway No. 1. When it is completed, My Thuan 2 Bridge will link Trung Luong – My Thuan expressway and My Thuan – Can Tho expressway to complete the expressway from Ho Chi Minh City to Can Tho City.

HCMC No.1 URBAN RAILWAY CONSTRUCTION PROJECT BEN THANH SUOI TIEN LINE

Metro Line 1 – Ben Thanh – Suoi Tien Line is a 19.7 kilometer long project with total 14 stations. This is the first line to be built under the whole Metro Line system; the subway shall be built according to Ho Chi Minh City urban railway planning. VNCN Engineering Construction and Investment Joint Stock Corporation shall implement construction from July, 2018.

Hanoi Pilot Metro Line Project, Nhon – Hanoi Railway Station Section

Nhon – Hanoi station railway line has total investment of over 36,000 billion VND, with 12.5 km length, including 8.5km of high line from Nhon to Kim Ma and 4km underground from Kim Ma to Hanoi station. The railway has 8 high stations, 4 underground stations and Depot area in Nhon.

CAO LANH BRIDGE IS OPEN TO TRAFFIC

Morning of May 27th, 2018, in Thinh Thoi commune – Cao Lanh city – Dong Thap province, the Ministry of Transport has hold the traffic opening ceremony of Cao Lanh Bridge and it’s inter-connecting roads between Cao Lanh Bridge & Cam Vong Bridge as part of Central Mekong Delta Region Connectivity Project.

Plant of waste classification, waste disposal, producing biogas

Project: Plant of waste classification, waste disposal, producing biogas and organic mineral fertilizers Construction Item: Fermentation Tank including heat piping system Location: Bo Trach – Quang Binh Construction period: 08/2017 – 01/2018 The project for plant of waste classification, waste disposal, producing biogas and organic mineral fertilizers, with a total investment of 1300 billion, was […]

Damen Song Cam Shipbuilding

Project: Damen Song Cam Shipbuilding Construction Item: Warehouse No.2 and concrete yard 4.5tons Location: Thuy Nguyen – Hai Phong Construction period: 10/2017 – 4/2018.   Warehouse No.2 Project belongs to Damen Song Cam Shipbuilding which was previous constructed by Vinaconex E&C and already handed-over to the Employer for services. The warehouse No.2 is constructed in […]