Monthly Archives: Tháng Mười 2019

HCMC No.1 URBAN RAILWAY CONSTRUCTION PROJECT BEN THANH SUOI TIEN LINE

Metro Line 1 – Ben Thanh – Suoi Tien Line is a 19.7 kilometer long project with total 14 stations. This is the first line to be built under the whole Metro Line system; the subway shall be built according to Ho Chi Minh City urban railway planning. VNCN Engineering Construction and Investment Joint Stock Corporation shall implement construction from July, 2018.

Hanoi Pilot Metro Line Project, Nhon – Hanoi Railway Station Section

Nhon – Hanoi station railway line has total investment of over 36,000 billion VND, with 12.5 km length, including 8.5km of high line from Nhon to Kim Ma and 4km underground from Kim Ma to Hanoi station. The railway has 8 high stations, 4 underground stations and Depot area in Nhon.